Selling a home with a septic system in Arizona? State law requires a licensed inspection within six months of closing. Premier Environmental is certified to perform this inspection, provide a detailed report, and help address any issues. After closing, the buyer must submit a Notice of Transfer to ADEQ within 15 days. We guide both buyers and sellers through the process for a smooth, compliant transfer.
Typical Inspection Fees
Required:
Transfer of Inspection Report: $400.00
Sewer Camera: $250.00/hr
Pumping: $500.00/1000 gallon
Site Specific:
Excavation $150.00/hr
Sewer Snake: $125.00
Sewer Smoking: $200.00/hr
Transfer or Ownership Inspection
Resources